5th day: 29 Aug 2004: The outside walls are there.

Desmond Ratford offered to help with the hut. We actually spent 1 hour on Saturday, about 5 hours on Sunday, 29 Aug, to continue putting up the walls. Here are some pictures. In the end we managed to put up all walls on the "main building", i.e. the left forward, left left, left backward wall. The trick is to temporarily fix the walls with temporary diagonals, as can be seen in the "view from the bottom".
 
click -> enlarge

Here you see Desmond helping.

 

click -> enlarge

The third wall is standing. The diagonals are important for stiffening the structure.

click -> enlarge

View from the bottom.
.

click -> enlarge

The so-called "Acceptance Test" for the structure - performed by Julius Koschny and Wiebe van den Berg. For a zoom look here.
 

 


Prepared by dvk, 02 Sep 2004.